RJE produced Process Piping Plans for the newly installed brew process chiller system at Los Dos Potrillos Castle Rock; a last minute requirement by an inspector. RJE was able to step in and quickly diagnose the field conditions and the installed piping, and create a plan set per the inspector’s requirements. This allowed Los Dos Potrillos to pass final inspection and open without further delays.